Another project installing our Fire Rated Solutions hydrant supports by #Hydrabuild at the new Parramatta Pool site by #Lipman and #Stantec as the Hydraulic Consultants.
All our components are fully tested with a FRL 90/-/, ActivFire certificate that supports that all our products are 100% code compliant. There will be is no problems with O/C and certainly no band aid solutions here. 1 step process making it cheaper, quicker, and more aesthetically pleasing.
They have used our pear clips for the horizontal runs hanging from the concrete celling and our 2 rod clamp along the block wall both vertically and horizontally.