With a 18mm diameter drill bit, drill hole 60mm deep |
Clean out hole with steel brush until hole is clean and dust free |
Insert Anchor (HKD) with internal thread facing outwards |
Strike with setting tool and hammer until seated |
Set laser for level and measure and cut rod lengths |
Install rods into Anchor (HKD) tighten to 100kpa |
Install top nut and tighten 100kpa until tight and snug to concrete |
Install bottom nut and screw up approximately 100mm above bottom of threaded rod |
Install 45mm retaining nut and adjust to suit level line |
Install bracket over pipe |
Lift pipe to level and slide clip onto 45mm retaining nut until snug fit |
Tighten top nut down onto bracket to 100kpa and snug to top of bracket |
DOCUMENTS & NEWS