Ezy Multi Service Transition Box Installation Instructions

Ezy Multi Service Transition Box with NBN, sprinkler, HVAC, gas, cold water, hot water, dry fire and electrical services fitted through one fire rated penetration

One fire rated penetration for all your building services

The Ezy Multi Service Transition Box takes the place of a separate penetration for every service. Every opening is cut at the factory in a fixed position, at the correct separation from the service beside it, so nothing is measured or marked on site.

  • Easier to install. Fix one box, then run each service through its own opening.
  • Easier to certify. The separation between services is set at the factory, so a certifier can see it is correct.
  • Clear for every trade. Each opening is colour coded and labelled, so every trade can see where its service goes.
  • Tested to AS 1530.4:2014. Patented design, available in 60, 90 and 120 minute fire ratings.
  • Made to suit your site. Each box is configured for the services running through your penetration.

Where the box is installed

The box is fixed to the concrete soffit, the underside of the concrete slab, on each level of the building. That is where most of the pipes and cables run.

Once the services are in, a drop ceiling is built below them, so the box and the services are hidden from view.

Front view of the Ezy Multi Service Transition Box showing the factory cut, colour coded and labelled openings for each building service

How to install the Ezy Multi Service Transition Box

  1. Fix the box to the concrete. Screw the box to the concrete soffit, the underside of the slab above.
  2. Fit the intumescent. Put two layers of intumescent on each end of the box.
  3. Fold in the tabs. Fold the tabs in, then screw in the bottom.
  4. Run the services. Put each service through its own opening, in the position marked for it.
  5. Seal the outside. Run a bead of sealant around the outside of the box and finish it to the correct fillet with the Fire Rated Solutions fillet card.

Step 4 in photos, one service at a time. Click a photo to enlarge it.

Approved pipes and conduit

  • ≤ 32 mm Pex
  • ≤ 32 mm Pex Al
  • ≤ 32 mm Pex with 10 mm FR insulation
  • ≤ 32 mm HDPE
  • ≤ 50 mm conduit, empty and full
  • ≤ 60 mm thick-wall steel
  • ≤ 50 mm copper, stainless steel and thin-wall steel (lagged with Ezy Wrap or Ezy Penno to achieve 60 min insulation)
  • ≤ 60 mm CPVC
  • ≤ 20 mm pair coil with 10 to 19 mm FR insulation

Approved cable groupings

  • Group 1. Orange Circular, ≤ 16 mm² 4C+E. Copper area ≤ 70 mm². Single cable only.
  • Group 2. TPS, ≤ 10 mm² per conductor. Copper area ≤ 84 mm². Maximum 8 per bundle.
  • Group 3. CAT, Coax, Security and fire cables. Copper area ≤ 3 mm². Maximum 11 per bundle.
Close up of gas and cold water pipes in the transition box showing the factory set separation between services

Tested and compliant

Tested to AS 1530.4:2014

Compliant to

  • AS 4072.1:2005 Service Penetrations and Control Joints
  • AS/NZS 3000 Electrical Installations
  • AS/CA S009 Communications
  • AS 1670 Fire Detection and Alarm Systems
  • AS/NZS 3080 Telecommunications Cabling
  • AS/NZS 3500.1 Water Services
  • AS/NZS 3500.4 Heated Water Services
  • AS 2118 Sprinkler Systems
  • AS/NZS 5601.1 Gas Installations
  • National Construction Code

Need help?

Every box is made to order. Talk to us about your project and we will confirm the right configuration for your services.

See the Ezy Multi Service Transition Box product page.