Ezy Multi Service Transition Box

One fire rated penetration for all your building services. Patented design with the service locations pre-cut at the factory to the correct separations. Tested to AS 1530.4:2014. Available in 60, 90 and 120 minute ratings, made to suit your site.

Every pipe and cable that passes through a fire rated wall or floor breaks the fire rating, and every one of those penetrations has to be sealed and separated to the standard that governs it. Electrical to AS/NZS 3000, communications to AS/CA S009, water to AS/NZS 3500, gas to AS/NZS 5601.1, sprinklers to AS 2118.

On site that usually means a separate penetration for every service, sealed by a different trade, with the separation distances measured by hand.

The Ezy Multi Service Transition Box replaces all of it with one unit. The service locations are pre-determined and cut at the factory to the correct separations, so compliance is built into the product instead of depending on how carefully it was set out on the day.

Patented design, factory set out

The openings are cut in fixed positions with the required separation between service types already established. Nothing is measured or marked on site. A certifier can inspect the installation and see the segregation is correct, because it was never variable in the first place.

Typical unit, dimensions in millimetres. HVAC services not shown.Water, gas, sprinkler, electrical and communications through one penetration.
Typical unit, dimensions in millimetres. HVAC services not shown. Water, gas, sprinkler, electrical and communications through one penetration.

Tested and compliant

Tested to

  • AS 1530.4:2014

Code compliant to

  • AS/NZS 3000 Electrical Installations
  • AS/CA S009 Communications
  • AS 1670 Fire Detection and Alarm Systems
  • AS/NZS 3080 Telecommunications Cabling
  • AS/NZS 3500.1 and 3500.2 Cold and Hot Water
  • AS 2118 Sprinkler Systems
  • AS/NZS 5601.1 Gas Installations
  • National Construction Code

Available in 60, 90 and 120 minute fire ratings.

Typical unit. Every opening is cut at the factory to the clearance required by the relevant standard. Dimensions in millimetres, HVAC services not shown.
Typical unit. Every opening is cut at the factory to the clearance required by the relevant standard. Dimensions in millimetres, HVAC services not shown.

Approved services

Pipes and conduit

  • ≤ 32 mm Pex
  • ≤ 32 mm Pex Al
  • ≤ 32 mm Pex with 10 mm FR insulation
  • ≤ 32 mm HDPE (blueline)
  • ≤ 50 mm conduit, empty and full
  • ≤ 60 mm thick-wall steel
  • ≤ 50 mm copper, stainless steel and thin-wall steel (lagged with Ezy Wrap or Ezy Penno to achieve 60 min insulation)
  • ≤ 60 mm CPVC
  • ≤ 20 mm pair coil with 10 to 19 mm FR insulation

Cable groupings

  • Group 1. Orange Circular, ≤ 16 mm² 4C+E. Copper area ≤ 70 mm². Single cable only.
  • Group 2. TPS, ≤ 10 mm² per conductor. Copper area ≤ 84 mm². Maximum 8 per bundle.
  • Group 3. CAT, Coax, Security and fire cables. Copper area ≤ 3 mm². Maximum 11 per bundle.

Custom made to suit specific sites

A typical unit carries nine services. The configuration is made to suit the services actually running through your penetration, so the box matches the job rather than the job working around the box.

Talk to us about your project and we will confirm the right configuration for your services.